Hasnain Ahmed Scaffolding

Loading

Drop Head

Drop Head

This component enables the early striking of the system allowing the Decking & the Infill Beams along with the plywood to be removed for re-use on upper levels in 3 to 4 days of concrete pour. Earlier, during and after the early striking, the top plate of the Drop Head used to maintain contact with the concrete which can be left in position till the concrete is cured.

WhatsApp Image 2024-03-04 at 8.51.46 AM
WhatsApp Image 2024-03-04 at 8.51.46 AM (1)
WhatsApp Image 2024-03-04 at 8.51.47 AM
WhatsApp Image 2024-03-04 at 8.51.47 AM (1)
WhatsApp Image 2024-03-04 at 8.51.47 AM (2)
WhatsApp Image 2024-03-04 at 8.51.48 AM

Contacts

Visit Us

Industrial Area 10, Near Police Station, Sharjah, UAE

Mail Us

Usmanscaffolding@gmail.com

Contact Us

+971555315477


Facebook-f


Twitter


Instagram


Linkedin